Masthead - Image
Home   •   Departments   •   Citizens   •   Business   •   Leisure   •   Online Payments   •   Downtown Wireless
Public Works - Traffic
Home
Contacts
FAQ
Signal Maintenance
Sign Maintenance
Special Event Permit
Traffic Management System
Traffic Engineering
Traffic Calming

A-Z Services Directory

Flood Prevention

Pedestrian Safety


LeftNav - Right Corner Image Main   >   Public Works   >   PW Traffic
SunTrust
Lakeland Regional Advanced Transportation Management System (LRATMS)
The Florida Department of Transportation along with City of Lakeland and Polk County are beginning the construction phase of a design/build project to upgrade the City’s control and monitoring of its network of traffic signals. Among the major features of the system are:

• Replace the 14 year old system, controlling approximately 160 signalized intersections (system had ability to control 250 intersections)
• Upgrade field communications system from copper wire to city-wide fiber optic cable
• Replace 176 traffic signal controllers and cabinets at 178 intersections
• Control and monitor 176 signalized intersections in Lakeland/Polk County on a second by second basis
• Renovate the Transportation Management Center (TMC), including:
• Uninterruptible Power Supply (UPS)
• Replace old DEC 3000 central computer with microcomputer-based system with built in redundancy
• Install 2 Windows 2000 servers (one as hot standby), 2 Windows 2000 workstations, one virtual workstation at Polk County Traffic Operations and 1 virtual workstation at FDOT Traffic Operations
• Install video wall consisting of 3 ea 50” plasma displays
System wide video monitoring for incident management (detection, verification and response) and signal timing evaluation
• One BARCO video controller to allow expansion of video system
• Install 44 strategically placed, fully controlled video monitoring cameras
• Interactive web site with real-time map display of congestion on major arteries; Display snapshots of any of the 44 cameras with image update approximately every two seconds and notification of construction, parades, incidents and any other disruption of normal traffic patterns
• Traffic responsive control capabilities
• New system utilizing IP addresses has the ability to control 4096 devices
• Each intersections will have UPS backup to maintain communications

Current Project Status
• $7.4 million budget
• Design phase completed
• TransCore selected as design/build firm
• TMS to utilize the latest version of TranSuite software
• Construction should start February 2005 with completion by June 2006

Desired/Future LRATMS Capabilities
• Fixed variable-message signs
• Possible companion with existing monitoring system along Interstate 4 for incident management
• Connection to any future FDOT Regional Transportation Management Center
• Traveler Advisory Radio (TAR)
• Parking lot advisory system
• Multiple Traveler Advisory Radio along major corridors in Lakeland and Polk County
• Mobile variable message sign control system