| CONSTRUCTION & MAINTENANCE DIVISION |
|
 |
| Streetscape |
|
This division is responsible for the street and drainage system, construction and maintenance projects and assists in the maintenance of the Citys lakes and environmental programs. The infrastructure inventory consists of roughly 667 miles of paved City streets and alleys, over 250 miles of sidewalks, as well as a City-wide storm drainage system that includes approximately 160 miles of underground storm sewer pipe, over 60 miles of ditches, approximately 8,000 storm inlets, 170 detention/retention ponds, 419 outfall structures, and 10 City-maintained lakes. |
|
|
 |
| Sidewalk |
|
The Construction Section provides services for a wide range of construction projects, including major roadways, parking lots, stormwater drainage systems, sidewalks, curbing, sanitary sewer projects, and City parks. |
|
|
 |
| Street Paving |
|
The Maintenance Section is responsible for resurfacing and striping of all City streets, grading roadways and alleys, cleaning pedestrian walkways and storm drain inlets, making roadway repairs, restoring utility cuts, and repairing or replacing damaged sidewalks, curb sections, stormwater inlets and other concrete structures. |
|
|
|